Project: WASTEWATER COLLECTION SYSTEM REHABILITATION – CURED IN PLACE PIPE PROJECT 2022

PM Construction & Rehab, LLC – ITB: Certified MBE/WBE Firms

Project: WASTEWATER COLLECTION SYSTEM REHABILITATION – CURED IN PLACE PIPE PROJECT 2022

Project Location: Lafayette, LA

Bid Due Date: 10/6/2022

Quotes Returned: 10/3/2022


Scopes:

  • CCTV & Cleaning (562998)
    • Pre CIPP CCTV & Cleaning San. Sewer , 8 – 15 Inch Dia.
    • Root Removal
    • Additional setup for CCTV Inspection
  • Traffic Control (561990)
    • Arrow Board Rental
    • Turnkey Single lane closure setup and operation w/ Flaggers , 12 HR Shift
  • Lateral Rehabilitation (237110)
    • Lateral CIPP Lining, 2’ – 5’ Per lateral


Specs/Plans /Questions– Ashden Middlebrooks | amiddlebrooks@teamipr.com | 470-503-5624

Recent Posts

Inland Pipe Rehabilitation Announces Definitive Agreement to Acquire Inliner from Granite Construction Incorporated

Feb. 3, 2022  Inland Pipe Rehabilitation ("IPR"), a portfolio company of investment affiliates of J.F. Lehman & Company ("JFLCO"), announced...
Read more...

IPR awarded NASTT’s 2021 Outstanding Trenchless Paper Award for No-Dig Show

November 2021 Bill Sharpe, Business Development Manager of IPR Southeast, and Joe Royer, Vice President R&D of Geotree Solutions, were...
Read more...

CIPP Used on 54-In. Sewer Pipes in San Antonio

August 2010 San Antonio Texas Water System (SAWS) received a report of an enormous sinkhole developing on Benita Street, close...
Read more...

Inland Pipe Rehabilitation Installs Cured-In-Place Pipe Renewal System at Dallas Water Utility, Saving the City Significant Money and Avoiding Lengthy Shutdown

May 2013 Inland Pipe Rehabilitation (IPR), the nation’s largest privately-owned trenchless infrastructure solutions provider, recently installed Cured-In-Place Pipe (CIPP) to...
Read more...

slideup