Project: Wastewater Collection System Rehabilitation and Renewal | Project No.: WBS No. R000266-0350-4, File No. 4236-08

PM Construction & Rehab, LLC – ITB: Certified MBE/WBE Firms

Project: Wastewater Collection System Rehabilitation and Renewal | Project No.: WBS No. R000266-0350-4, File No. 4236-08

Project Location: Houston, TX

Bid Due Date: 9/22/2022

Quotes Returned: 9/19/2022


Scopes:

  • Sanitary sewer cleaning & CCTV
    • Cleaning & CCTV Gravity Sewer
      • 6” – 36” Diameter Sewer
    • Siphon Cleaning & Inspection
      • 6” – 48” Diameter Siphon
    • Mechanical Cleaning
      • 6” – 36” Diameter Sewer

 

  • Traffic control
    • Flagmen & Certified Flagmen

 

  • Bypass Pumping for Sanitary Sewer
    • 6” – 16” setup and pump operation

 

  • Open Cut Utility Repairs (6” – 48” Diameter)
    • Hand Excavation Pits
    • Obstruction removal by excavation
    • Sanitary Sewer force Main replacement
    • Sanitary Sewer point repairs
    • Sanitary sewer main remove & Replacement
    • Slurry Boring
    • Air release valve removal & replacement on force main
    • Adjust Manholes
    • Air Release Valve Manhole Install
    • Standard FG manhole Install
    • Precast concrete manhole Install

 

  • Manhole Rehabilitation
    • Concrete Liner
      • COH Approved Products
    • Chemical Grout
    • Manhole Bench rehabilitation

 

  • Concrete & Asphalt repairs
    • Remove & Replace concrete Driveway & Sidewalk
    • Curb & Gutter removal & Replacement
    • ADA Ramp Install
    • Asphalt Patching
    • Asphalt Mill & Overlay
    • Curb

 


Specs/Plans /Questions– Ashden Middlebrooks | amiddlebrooks@teamipr.com | 470-503-5624

Recent Posts

Inland Pipe Rehabilitation Announces Definitive Agreement to Acquire Inliner from Granite Construction Incorporated

Feb. 3, 2022  Inland Pipe Rehabilitation ("IPR"), a portfolio company of investment affiliates of J.F. Lehman & Company ("JFLCO"), announced...
Read more...

IPR awarded NASTT’s 2021 Outstanding Trenchless Paper Award for No-Dig Show

November 2021 Bill Sharpe, Business Development Manager of IPR Southeast, and Joe Royer, Vice President R&D of Geotree Solutions, were...
Read more...

CIPP Used on 54-In. Sewer Pipes in San Antonio

August 2010 San Antonio Texas Water System (SAWS) received a report of an enormous sinkhole developing on Benita Street, close...
Read more...

Inland Pipe Rehabilitation Installs Cured-In-Place Pipe Renewal System at Dallas Water Utility, Saving the City Significant Money and Avoiding Lengthy Shutdown

May 2013 Inland Pipe Rehabilitation (IPR), the nation’s largest privately-owned trenchless infrastructure solutions provider, recently installed Cured-In-Place Pipe (CIPP) to...
Read more...

slideup