Project: Wastewater Collection System Rehabilitation and Renewal - 4259-28

PM Construction & Rehab, LLC – ITB: Certified MBE/WBE Firms

Project: Wastewater Collection System Rehabilitation and Renewal - 4259-28

Project Location: Houston, TX

Bid Due Date: 10/06/2022

Quotes Returned: 10/03/2022


Scopes:

  • Clean/CCTV-6”-48” Gravity Sewers, Force mains & Siphons
  • Traffic Control- Flaggers, Lane Closures, Std. Signs & Cones.
  • Bypass- Pumps & Piping per the bid form
  • Static & Pneumatic Pipe Bursting
  • Material – 6”-18” HDPE Piping; Pre-cast Manholes
  • Slip-Lining
  • Grouting
    • Grouting for the annular space for the slip-lined mains
    • Chemical grouting of the manholes
  • Manhole Rehabilitation by 1” thick concrete liner-City of Houston Wastewater Approved Products List
  • Open Cut Work
    • Well Pointing/Dewatering System
    • Trench Safety System
    • Special excavation by hand
    • Obstruction Removal by Excavation
    • Remove & Replace Sanitary sewer mains
    • Point Repairs by excavation
    • Abandonment of point repairs
    • Slurry Boring
    • Service Reconnect by Excavation
    • Cement Stabilized Sand Backfill
    • Install Sanitary Sewer Cleanouts
    • Remove & Replace Air Release Valves
    • Adjust/Reset Manhole Frame & Cover
    • Raise Manhole to Grade
    • Install Air release valve manholes
    • Remove & Replace/ Install New Manholes/ Fiberglass Manholes
    • Remove & Replace Sidewalks/ Pavement/ Driveways/ Curb & Gutter/ Ramps
    • Milling & Overlay
    • Remove & Replace Trees


Specs/Plans /Questions– Ashden Middlebrooks | amiddlebrooks@teamipr.com | 470-503-5624

Recent Posts

Inland Pipe Rehabilitation Announces Definitive Agreement to Acquire Inliner from Granite Construction Incorporated

Feb. 3, 2022  Inland Pipe Rehabilitation ("IPR"), a portfolio company of investment affiliates of J.F. Lehman & Company ("JFLCO"), announced...
Read more...

IPR awarded NASTT’s 2021 Outstanding Trenchless Paper Award for No-Dig Show

November 2021 Bill Sharpe, Business Development Manager of IPR Southeast, and Joe Royer, Vice President R&D of Geotree Solutions, were...
Read more...

CIPP Used on 54-In. Sewer Pipes in San Antonio

August 2010 San Antonio Texas Water System (SAWS) received a report of an enormous sinkhole developing on Benita Street, close...
Read more...

Inland Pipe Rehabilitation Installs Cured-In-Place Pipe Renewal System at Dallas Water Utility, Saving the City Significant Money and Avoiding Lengthy Shutdown

May 2013 Inland Pipe Rehabilitation (IPR), the nation’s largest privately-owned trenchless infrastructure solutions provider, recently installed Cured-In-Place Pipe (CIPP) to...
Read more...

slideup