Project: Wastewater Collection System Rehabilitation and Renewal 4259-17 – Houston, TX

PM Construction & Rehab, LC dba IPR South Central – ITB: DBE/MBE/WBE/SBE Firms

Project: Wastewater Collection System Rehabilitation and Renewal 4259-17 – Houston, TX

Bid Date: 07/08/2021

Quotes Returned: 07/02/2021 – 5:00pm


SCOPE

  • Clean/CCTV
    • 6” – 36” all depths
    • Cleaning Siphons all depths
    • Mechanical cleaning 6” – 36”
  • · Traffic Control Plan
    • Traffic Control – Flaggers, Lane closures, standard signs and cones
  • · Open Cut
    • Diversion Pumping 6” – 36”
    • Traffic Loop
    • Well pointing/Dewatering
    • Trench Safety plan
    • Excavation by hand (Entry/Exit pits)
    • Obstruction removal by excavation and Remote methods
    • Point repairs
    • Pipe replacement beyond point repairs 6” – 48“all depths
    • Abandonment of point repairs
    • Cut or remove existing liners from host pipe
    • Slurry Boring 8” – 12” up to 15’ Depths
    • Reconnect Service connection by excavation, remote, hand excavation
    • Cement stabilized sand backfill
    • Sliplining of existing Service line
    • Abandonment of sanitary sewer
    • Cleanout Sanitary sewer
    • Remove and replace up to 2”-4” air release valve
    • Manhole adjustment new frame and covers
    • Install 4’ – 8’ Dia. Manholes, concrete, fiberglass
    • Remove and replace fencing, all materials
  • · Manhole Rehab
    • 1” Thick concrete liner
    • Chemical grouting
    • Manhole inserts
    • Benches and inverts
  • · Concrete
    • Remove and replace 4-1/2” concrete sidewalk
    • Remove and replace 6” concrete driveway
    • Remove and replace 8” concrete pavement
    • Remove and replace Curb and Gutter
  • · Asphalt
    • Remove and replace 2” HMCA (type-D)
    • Remove and replace semi-rigid base
    • Milling of pavement
    • Asphalt overlay 2” HMAC
    • Saw joint
  • · Landscape
    • Remove and replace trees

Specs/Plans – Katie Hill | khill@teamipr.com | 678-436-6814

slideup