Project: FY2022 Local Drainage Program (LDP) Contract #2 - Houston, TX

PM Construction & Rehab, LLC dba IPR South Central – ITB: Certified DBE/MBE/WBE/SBE Firms

Project: FY2022 Local Drainage Program (LDP) Contract #2 - Houston, TX

             Bid Due: 07/29/2021

             Quotes Returned: 07/26/2021


Scopes:

  • Clean
    • Blast Cleaning pavement markings
    • Storm sewer cleaning 18” – 72”
    • Concrete box sewers cleaning
    • CCTV
  • Traffic Control
    • Local streets
    • Major thoroughfares, collectors or Signalized intersections
    • Flagmen for local streets to Major thoroughfares, collectors or Signalized intersections
    • Concrete low profile traffic barrier
    • Stabilized construction exit
    • Installation traffic sign
    • Chain link fence and gate Remove and replace
  • Landscaping
    • Tree and Plant Protection
    • Tree planting
  • Preparatory Work for Sampling & Analysis in PPCA
  • Open Cut
    • Remove and replace Chain link fence, specialty fence, Type III barricade, pipe bollards, mailboxes
    • Transportation and disposal of groundwater and soil from PPCA
    • Remove and dispose of tires
    • Clearing and Grubbing
    • Mowing, fence line pruning, Herbicide
    • Remove and dispose of trees
    • Zero curb cutback
    • Checker plate
    • Remove and replace curb and gutter,
    • Milling, remove and dispose of gravel driveway, concrete pavements, misc masonry sidewalks
    • Roadway excavation
    • Lime for stabilization
    • Cement stabilized sand
    • Saw cut concrete, asphalt
    • Concrete paving header, Type A &D Hot mix
    • Reinforced concrete pavement 6” – 12” thick
    • High early strength reinforced concrete pavement 6’ – 12”
    • Cement stabilized course 6 – 12 inch thick
    • 6” & 7” concrete driveway
    • Concrete curb and gutter, sidewalks wheel chair ramp
    • Street lighting
    • Thermoplastic pavement markers4” – 24” wide
    • Speed Cushions
    • Flowable Fill
    • Borrow/embankment
    • Ground water control – Open cut
    • Trench safety
    • Adjust existing inlet to new grade, frame and covers
    • Grout and fill abandon manhole and storm sewer 12” – 78”
    • Remove and dispose of trench drain inlet, 21” storm sewer and leads, 24” – 72” storm pipe
    • Remove and dispose of storm culvert, including box
    • Type C manholes, Junction boxes, ring grate 18” – 72”, elliptical pipe 18” – 42”
    • Storm sewer by open cut (RCP) 18” – 96”
    • Storm culvert, Augering, in tunnel, lead (RCP & HDPE) 18” – 96”
    • Storm box multiple sizes
    • CMP storm sewer outfall
    • Point repairs
    • Riprap and granular fill, site restoration
    • Top soil, hydromulch seeding
    • Sodding
    • Reinforced Concrete channel lining 5” – 10” thick
    • Headwall
    • Gabion
    • Safety end treatments
    • Type A, B-B, BB, C, E inlets
    • CIPP or Spin Cast lining 24” – 96”
    • Slip lining
    • Adjust valve box, meter box
    • Fire Hydrant
    • Remove and dispose of water line 4” – 12”
    • Cut, plug and abandon water lines
    • Install DIP water lines, PVC drain lines open cut, trenchless, augering
    • Wet connections
    • Valve boxes
  • Erosion Control
    • Drop inlet baskets, Inlet protection, Sandbags
    • Brush berm
    • Storm inlet sediment, filter fabric
    • Sediment basin


Specs/Plans – Katie Hill |khill@teamipr.com| 678-436-6814