News & Media

EcoCast Application at Sears Crosstown Box Culverts in Memphis, Tennessee

Situation In 2015, the City of Memphis’ Sears Crosstown box culvert system was under inspection. The inspection included the evaluation of twin 8’ x 10’ concrete box culverts, each a length of 500 linear feet, that are part of the Madison Heights drainage basin. The assigned engineering firm concluded that...
Read more...

EcoCast Stormwater Rehab in El Cajon California

July 2015 The City of El Cajon, California, has suffered consistent long-term exposure to excessive groundwater flowers, severe corrosion, and several offset joints of corrugated metal pipe in number places. The city's stormwater system was in dire need of repair. As a result, the city put its 2013 Sewer and...
Read more...

Geopolymer mortar system in the U.S. Army

September 2016 The U.S. Army Engineer Research and Development Center and Fort Bragg’s Directorate of Public Works demonstrated and validated the performance characteristics of a new geopolymer mortar liner system for culvert rehabilitation at Simmons Army Airfield, North Carolina. This rehabilitation technique uses geopolymer mortars that are often from the...
Read more...

Monteagle WTP Restorative Makeover Saves Time and Money

September 2013 Upkeeping infrastructure within rural communities is a full-time job. Most infrastructure requires daily maintenance, funding, and consistent state quality check. Within the quaint town of Monteagle, Tennessee, the city's water treatment plant was deteriorating rapidly. The combination of the age of age and environmental conditions had taken their...
Read more...